💥 Gate Square Event: #PostToWinCGN 💥
Post original content on Gate Square related to CGN, Launchpool, or CandyDrop, and get a chance to share 1,333 CGN rewards!
📅 Event Period: Oct 24, 2025, 10:00 – Nov 4, 2025, 16:00 UTC
📌 Related Campaigns:
Launchpool 👉 https://www.gate.com/announcements/article/47771
CandyDrop 👉 https://www.gate.com/announcements/article/47763
📌 How to Participate:
1️⃣ Post original content related to CGN or one of the above campaigns (Launchpool / CandyDrop).
2️⃣ Content must be at least 80 words.
3️⃣ Add the hashtag #PostToWinCGN
4️⃣ Include a screenshot s
The rooftop distributed photovoltaic project (Phase I) of Lansi Technology Huanghuayuan District is connected to the grid for power generation.
Jinshi data news on August 6th, Lansitech announced that on August 5th, Lansitech held a grid-connected and production ceremony for the full capacity of the photovoltaic power generation project in the Huanghuayuan area, marking the grid-connected power generation of the distributed photovoltaic project (Phase I) of Lansitech Huanghuayuan area. As an important part of Lansitech’s 128.2MW distributed photovoltaic project, the total installed capacity of the rooftop distributed photovoltaic project in the Huanghuayuan area is about 20MW, with a high installed capacity of 16.17MW realized in the first phase.